How Long Does Air Conditioning Installation Take?

A single wall-mounted split takes half a day to a day to install; a multi-split serving two or three rooms takes one to two days; a ducted whole-house system takes three to seven days and is usually done during a refurbishment. The longer wait is the one before the engineers arrive — typically one to four weeks from accepting a quote, and longer in a heatwave. Here is the full timeline from enquiry to cool air, and how to keep it short.

Get free air conditioning quotes

Installation time by system type

SystemTime on siteEngineersWhat takes the time
Single split (one indoor, one outdoor)Half a day – 1 day1–2Core drilling, bracket and outdoor unit, pipe run and trunking, electrics, pressure test, vacuum, commissioning
Multi-split (2–3 indoor units)1 – 2 days2Several pipe runs to one outdoor unit; longer evacuation; each indoor unit commissioned
Multi-split (4–5 indoor units)2 – 3 days2–3As above, plus routing through lofts or voids and more making good
Ducted whole-house3 – 7 days2–3 + builder's tradesDuctwork in voids, grilles, plasterboarding and decoration, controls, balancing
Like-for-like replacement of an existing splitHalf a day1–2Refrigerant recovery, swap units, re-use or replace pipework, recommission

Typical durations for a standard house or flat with reasonable access; awkward pipe runs, high outdoor positions and new circuits add hours rather than days. Your quote should state the installer's estimate.

The timeline from enquiry to cool air

  1. Enquiry and matching (same day – 2 days). You describe the job at /quote; Air Con Surrey matches you with vetted, F-Gas certified local engineers who contact you to arrange a survey.
  2. Site survey (within about a week). 30–60 minutes: room sizes and heat gains, unit positions, pipe route, condensate drainage, electrical supply, planning considerations.
  3. Written quote (1 – 3 days after). Itemised — see our quote comparison guide. Getting three quotes can add a week, and is worth it.
  4. Acceptance and booking (1 – 4 weeks' lead time). Equipment is ordered — popular ranges are usually in UK stock, some premium or designer models take longer — and a date set. In spring and autumn one to two weeks is common; in July and August during a heatwave, four weeks or more is normal because every installer's diary fills at once.
  5. Installation (half a day – 7 days, per the table).
  6. Commissioning and handover (the last hour). Pressure test and vacuum complete, charge recorded, system run in both modes, controls and app set up, commissioning sheet and warranty registration handed over.

End to end: two to five weeks outside the summer peak; four to eight weeks if you start in a heatwave. If you want air conditioning for next summer, the calm months are September to April.

What to prepare before the engineers arrive

  • Clear the wall where the indoor unit is going and the area beneath it; cover furniture — core drilling produces dust.
  • Clear the outdoor-unit position and the route to it; unlock side gates; move cars if a tower or scaffold is coming.
  • Confirm the pipe route agreed at survey so there is no debate on the day about where the trunking runs.
  • Electrics: make the consumer unit accessible if a new circuit is being added; expect the power off briefly.
  • Permissions: in a flat, conservation area or listed building, have consents or freeholder permission in hand — see our planning guide.
  • Neighbours: a word in advance about a day of drilling and an outdoor unit saves friction later.
  • Wi-Fi password ready if the unit has app control — commissioning includes pairing it.

How disruptive is it?

For a wall-mounted split: modest. The noisy part is core-drilling a 65–80 mm hole through the external wall for the pipes, a few minutes per unit. The rest is bracket fixing, pipework, trunking and quiet electrical and commissioning work under dust sheets; you can normally use the rest of the house as usual and the room again that evening. A multi-split adds another day of the same. A ducted installation is building work — ceilings opened, ducts run, plasterboard and decoration made good — best done within a wider refurbishment or while the house is empty. Pipework is usually boxed in white trunking outside and hidden in voids inside where possible; concealing it in walls is a decorating job to plan for.

Commissioning: why the engineer should not rush it

Commissioning decides the system's longevity. The circuit is pressure-tested with nitrogen to prove it is tight, then a vacuum pump removes air and moisture — a proper deep vacuum can take 30–60 minutes on its own. Only then is refrigerant released from the outdoor unit (with any extra charge weighed in for long runs). The engineer runs the system in both modes, checks temperatures and currents, sets up the controller and app, and completes a commissioning sheet you should keep. An installer who packs up 20 minutes after connecting the pipes has skipped something. For the paperwork, see our F-Gas certification guide.

FAQs

Half a day to a day for a standard wall-mounted split with straightforward access. Core drilling, mounting, pipe run, electrics, pressure test, vacuum and commissioning are all done in that visit.
One to two days for two or three indoor units on a single outdoor unit; two to three days for four or five rooms, because each pipe run has to be routed, evacuated and commissioned separately.
Three to seven days for a typical house, plus builder's work to close ceilings and redecorate. It is normally scheduled within a refurbishment or before occupation rather than in a lived-in home.
Typically one to four weeks from accepting a quote. In spring and autumn one to two weeks is common; during a summer heatwave four weeks or more is normal. End to end, including survey and quotes, allow two to five weeks outside the peak.
Yes, for a single split and often for a two-room multi-split, provided the survey is done, the pipe route agreed and access clear. Commissioning — pressure test, vacuum and a run in both modes — still needs its full time at the end of the day.
Clear the indoor-unit wall and the route to the outdoor position, unlock gates, make the consumer unit accessible, have any planning or freeholder permission in hand, warn neighbours about a day of drilling, and have your Wi-Fi details ready for app pairing.

Sources & methodology

  • Installation durations and lead times: typical figures reported by installing engineers in the Air Con Surrey network for domestic split, multi-split and ducted systems, 2026.
  • Commissioning procedure (nitrogen pressure test, evacuation, charge, run test): manufacturer installation manuals and UK F-Gas good-practice guidance.
  • Planning: Town and Country Planning (General Permitted Development) (England) Order 2015 as amended.